欧美精品在线免费-欧美精品在线看-欧美精品在线观看视频-欧美精品在线观看-欧美精品在欧美一区二区-欧美精品影院

Your present position:Home >> Use and Maintenance of Air-jet Loom
Use and Maintenance of Air-jet Loom
Time:[2019-8-7]    Pageview:7440

Use and maintenance of air-jet looms:

I. Periodic Maintenance

1.Daily maintenance and handling

Maintenance workers need to carry out routine maintenance of electric oil pump, centralized oil supply, heat dissipation part of main motor, input shaft of open cam box, electromagnetic brake, weft detector, scissors, winch, side brace and edge-trapping yarn.

2.Maintenance and disposal of machine time

Check whether the side brace ring rotates flexibly, whether it is worn, whether there are flying flowers, whether the interval between stop pin and main drum is 0.5 mm, whether the air pipe leaks, whether the centralized oil supply leaks, whether the oil pipe is damaged or bent, whether there are flying flowers in the control box, confirm whether the height error of the heald frame is less than 2 mm, and whether the air filter exhausts. Whether the pipe is unblocked, whether there are flying flowers on the pinion of the warp shaft, whether there is yarn head on the bevel gear shaft of the opening device, whether the screen hole on the oil filter is blocked, whether yarn head is rolled on the warp let-off and loosening axles, whether there is damage to the insulating sleeve of the wire and whether the clearance of the brake is correct. Fuel the nozzle, the gear face and chain of the open gear, and check whether the heald frame and the guide plate of the heald frame are worn or not.

3.Half-yearly overhaul and treatment

It is necessary to check whether the winding is clean, whether there are yarn marks and scars on the main drum and pin drum, whether the inside of the stop pin assembly is dirty, whether the open wire rope is elongated or damaged, whether the recovery spring is damaged, and whether the bearing of the open wire rope connecting seat is worn. Whether the belt tension is appropriate or not, whether there is damage, whether the sensors are working properly, whether the transmission gear box, coiling gear box and sending gear box are replaced with lubricating oil, whether the filter sieve is blocked, whether the reed is stained with dirt, whether the wind speed value is normal, and whether the U-shaped shaft lining of the pull-down hook is normal. Whether the wear is less than 2 mm, whether the main nozzle duct is bent, whether the coiling roller chain is elongated, whether the clearance between planetary gears is normal, whether the wear of the axle lining of the planetary tube seat is less than O.5 mm, whether the wear of the axle lining of the planetary tube is less than 0.5 mm, whether the wear of the axle lining of the planetary tube is less than O.5 mm, whether the auxiliary nozzle is scratched or not. There are yarn marks, whether bending or not, whether there is oil in the scissors device, and so on.

4.One-year overhaul and disposal

Whether the screw of the support foot of the main nozzle is loose or not, the screw should be tightened again.

5.Overhaul and disposal in two years

Whether the winding roll, pressing roll and rough rubber are worn, whether the warp and warp parts of the warp axle are worn within 0.3 mm, whether the buffer performance is reduced, whether the nylon bushing and the guide pin column of the buffer are worn, whether the auxiliary nozzle is dirty, whether the weft is cut correctly by the side shearing device of the yarn supply, whether the stop pin hole of the stop pin assembly is worn or not. Whether the wear of the roll shaft of the coiling cloth is less than 0.5 mm or not is less than 0.5 mm.

6.Overhaul and disposal in three years

Whether the lubricating oil of solenoid valve is insufficient and whether the coiling cloth roll rotates flexibly.

7.Seven-year overhaul

It includes the maintenance of bearings, oil seals, gears, cams, axle linings, stop pins, main motors, frame, opening, warp feeding, winding and weft storage parts.

二、Contents and Notices to be Preserved by Loom Institutions after Long-term Use

(1)Main transmission part: After long-term use of the loom, it is necessary to replace the oil seal of the crankshaft bearing seat of the driving part.

(2)Opening part: It is necessary to replace the cam open arm bearing, wire rope, heald spring and heald arm bearing.

(3)Replacement of synchronous toothed belt and cleaning of oil filter.

(4)Clean reed regularly.

(5)The inner parts of the length measuring and weft storage drum are replaced, the inner parts of the stop pin are replaced, and the encoder is cleaned.

(6)Main nozzle cleaning, filter cleaning, cleaning and repair of solenoid valve and pressure regulating valve, inspection and configuration of gas pipe.

(7)Servo motor maintenance and replacement, buffer repair and internal parts replacement.

(8)Check coiling brake rollers, chains, tensioning wheels, adjusting pins and replacement, maintenance and replacement of friction discs and discs. Inspection and replacement of rough rubber.

(9)Check and replace planetary gear, tube bearing, guide arm shaft and coupling.

(10)Inspection and replacement of weft detection cable

Previous: 暫無

Next: 噴氣織機:賣點在于低耗

主站蜘蛛池模板: 日韩福利视频一区 | 日韩国产午夜一区二区三区 | 波多野结衣a v免费观看 | 欧美日本日韩aⅴ在线视频 欧美日本三级 | aav在线| 成人午夜免费福利 | 国产成人一区二区三区免费观看 | 国产综合视频 | 最新国产午夜精品视频成人 | 日产乱码卡一卡2卡三卡四忘忧草 | 国产真实女人一级毛片 | 一二三四在线观看免费高清中文网 | 中文字幕777 | 欧美在线播放成人免费 | 国产日韩亚洲欧洲一区二区三区 | 国产αv| 福利视频秘密网址在线观看 | 久久青草热 | 日本精品一区二区三区在线视频 | 黄色刺激视频 | 外国毛片在线观看 | 日本强在线播放一区 | 免费国产成人高清在线观看视频 | 天堂网一区二区 | 亚洲免费二区 | 日本免费人爱做在线观看视频 | 一级a毛片免费观看 | 国产亚洲三级 | 免费一级特黄a | 在线亚洲免费 | 一级黄色大全 | 中文字幕在亚洲第一在线 | 色婷婷国产精品欧美毛片 | 日韩在线视精品在亚洲 | 手机看片一区二区 | 欧美在线观看成人高清视频 | 5060网永久免费一级毛片 | 成人啪精品视频免费网站 | 欧美一级特黄aa大片在线观看免费 | 国产精品高清全国免费观看 | 农村妇女色又黄一级毛片不卡 |